Daventry

Solar panels and battery storage in Daventry

iComm Energy Solutions installs solar panels and battery storage for homes and businesses in Daventry and the surrounding villages. We're based at Moulton Park in Northampton, so you deal with a local team from first survey to switch-on.

Areas we cover around Daventry

We install across Daventry and nearby, including Long Buckby, Braunston, Weedon Bec, Welton, Norton, Badby, Flore. Daventry is around 25 to 30 minutes from our Moulton Park base along the A45.

Good to know if you live in Daventry

0% VAT on qualifying installations

Solar panels and battery storage fitted to homes currently carry 0% VAT, until 31 March 2027. It is applied automatically on qualifying jobs.

How it works

  1. Free site survey. We visit your Daventry home, check the roof, shading and electrics, and talk through what you want from the system.
  2. Clear quote. An itemised, no-obligation quote with expected generation and savings.
  3. Installation. Fitted with our MCS-certified installation partners, typically over 1 to 3 days, depending on system size.
  4. Handover. Tested, certified and registered, with the paperwork you need for the Smart Export Guarantee.